DTNEXT

Breastfeeding rooms, escalators, other new facilities at Metro stns

CHENNAI: The Chennai Metro Rail Limited (CMRL) has deployed an automatic train wash plant and train mobile lifting jack for rolling stock maintenance.

The facilities were inaugurated by top officials at the Wimco Nagar depot on Friday.

As per the official CMRL press note, the automatic train wash plant is in the elevated section at Wimco Nagar depot. It allows for quick and efficient external cleaning of trains without disrupting the daily operations of CMRL. This helps to maintain clean, safe, reliable, and comfortable trains for passengers.

The automatic train wash plant is equipped with automatic sensors that start the washing process at the time the train enters the plant. To wash one fourcoach train set, the wash plant uses 2,000 litres of water, out of which 1,600 litres (80%) is recycled and reused.

It takes approximately 10 minutes to complete washing of one of the four-car train sets of CMRL. A camera-based monitoring system is installed to remotely monitor and control the washing process from the control centre located at Wimco Nagar depot, as the press note stated.

The mobile lifting jack is a train lifting mechanism used for under-frame inspection and major overhauling of rolling stock. It’s an essential piece of equipment for carrying out overhauling of rolling stock.

Meanwhile, the CMRL has installed two escalators from the concourse to platform 1 and 2. This is part of 41 additional escalators installed for passengers.

Additionally, to help new mothers, it has set up feeding rooms at Puratchi Thalaivar Dr MGR Central Metro station, Vadapalani, Egmore, CMBT and Washermenpet Metro stations.

Through these facilities, the CMRL is aiming to spike the ridership, as in March alone, 69.99 lakh passenger footfall was recorded. On March 10, the highest passenger flow was recorded of 2.58 lakh passengers.

In March, 21.61 lakh passengers used the QR code ticketing system and 44.76 lakh passengers used travel card ticketing. About 3.55 lakh passengers used the token system and 5,393 passengers used the group ticketing system.

To help new mothers, the CMRL has set up feeding rooms at Puratchi Thalaivar Dr MGR Central Metro station, Vadapalani, Egmore, CMBT and Washermenpet Metro stations

CITY

en-in

2023-04-02T07:00:00.0000000Z

2023-04-02T07:00:00.0000000Z

https://news.dtnext.in/article/281621014600926

Daily Thanthi